cost period

英 [kɒst ˈpɪəriəd] 美 [kɔːst ˈpɪriəd]

成本计算期

经济



双语例句

  1. Total cost in a period of time
    某一时间段内的总成本
  2. Use the combined welding operating technique, ensured the requirement of welding quality and reduced the cost and period of manufacture.
    采用组合焊接操作技术,即保证了焊缝焊接质量要求,又大大节约了制造成本,并缩短了制造周期。
  3. A department often begins and ends a cost period with partially processed units of product, so the completed units in the department are not an accurate measure of the department's total production.
    一个车间在期初和期末通常都有在产品,所以本车间发生的成本并非已完工成品的成本。
  4. The intension of integrate plan of engineering cost and construction period is analyzed based on earning value method.
    以挣值管理方法为研究内容,分析工程造价与施工工期集成计划的内涵。
  5. The reduction of the value of an asset by prorating its cost over a period of years.
    经过一段时间的价值分摊来降低资产价值的行为。
  6. The dissertation discusses the design change influence on quality, time, and cost during the period of development phase, manufacture phase, and sale phase.
    对设计变更影响度分析按照设计开发阶段的变更、制造阶段的变更和产品已经投放市场的变更,围绕变更的质量管理、时间管理和成本管理进行论述。
  7. Whole-process control of cost, including project decision, rough estimation of investment, budgetary estimation at period of design, contract cost at period of construction and final accounts, should be permeated from beginning to end of the construction process.
    文中提出要进行事先、主动且贯穿于项目建设全过程的工程造价控制,即从项目决策、投资估算、设计阶段的概算,到实施阶段的承包合同价和完工后的竣工决算。
  8. The integration and optimization of software become possible because of the existence of open source project. And then the cost and period of development are reduced.
    开放源码的存在使得软件的集成和优化开发成为可能,并可以减少软件企业的运营成本和开发周期,而且开发的系统也更为符合标准和技术的发展方向。
  9. This paper analyses and contrasts the cold forming section construction with traditional steel structure and rebar construction in consumption of steel, cost and period of manufacture.
    并对冷弯型钢结构的建筑与普通钢结构以及钢筋混凝土结构的建筑在建设周期、用钢量及造价等方面作了分析、比较。
  10. After the balance on technology, quality, cost, and period, the optimal structural system scheme is selected, and the rationality, feasibility, economics, advancedness, and scientificalness are ensured.
    最后综合权衡研究三个备选方案在技术、质量、成本、周期等多方面的优劣,选择了最佳结构总体方案,确保了所选方案具有合理性、可行性、经济性、先进性和科学性。
  11. On Relation of Construction Cost and Period
    浅述工程造价与施工工期的关系
  12. For the sake of reducing cost, shortening period of design, manufacture, in-stalling and debugging, standard impact molding system has been exploited.
    为了降低成本,缩短设计、制造、安装调试时间,开发了标准冲击造型系统。
  13. The combination of geological exploration and mining is an effective approach to the reducing of operation cost and period.
    实行探采结合是矿山生产勘探的一条重要原则,也是降低矿山生产成本,缩短生产周期的有效途径。
  14. Seeking efficiency in controlling the cost of construction period;
    从工期成本控制上要效益;
  15. Et out, bring upped the special molding tool design the manufacturing craft the factor from this background with the cost, period model.
    从这一背景出发,提出了独特的模具设计制造工艺链和成本、周期模型。
  16. With lower cost, shorter period and better repeatability, numerical simulation is helpful to physical test.
    与侵彻试验相比,数值仿真具有可重复性好、周期短、成本低的优点,对物理试验具有重要指导意义。
  17. Results: With the modified Guanidine Thiocyanate method, high-quality and good-integrality total RNA was achieved and the cost time period for the isolation of RNA was sharply shortened.
    结果:进一步改进的异硫氰酸胍法能够提取到质量高(OD260/OD280的值介于1.8~2.0)、完整性好的总RNA,且将提取时间缩短为原来的一半(全程仅需2~3小时)。
  18. Heater revamping in Shijiazhuang Refinery showed that the processing capacity of the heater enhanced by 27%, the water injected to radiation tubes decreased by 42%. The normal running period reached 13 months and the revamping cost recovery period was only 1 month.
    该技术应用于石家庄炼油厂延迟焦化加热炉改造的结果表明,加热炉处理能力提高了27%,辐射炉管注水量降低了42%,正常运转周期达13个月,改造投资回收期仅1个月。
  19. The project economic evaluation consists of manufacture cost and period expense, which should be evaluated in combination of both the exterior circumstance of the project and the level of the construction technique of the construction enterprise concerned.
    项目经济评估的内容按制造成本和期间费用进行划分,结合项目外部环境和企业施工技术水平进行评估。
  20. Taking the regional cooling and heating system of a residential area for example, a technical and economic comparison on four kinds of schemes for the system is made by using calculation methods of life cycle cost and cost recovery period.
    以某住宅小区区域供冷供热系统为例,采用计算寿命周期成本和成本回收期的方法,对系统的4种方案进行经济技术比较。
  21. Some formulas are listed for calculating investment amount, operating cost, recoverable period and optimal benefits.
    列出一些计算公式,供计算投资费、运转费、回收期限以及最佳效益之用。
  22. The application of embedded IP core, which reduced the cost and period of design, has become an important present design method of SOC.
    嵌入式IP核的应用,由于重用设计思想和设计知识,极大地降低了设计成本,缩短了设计周期,成为当今片上系统的重要设计手段。
  23. At the same time, it also has some disadvantages, so develop new quinolones which has the high activity and low side-effect is the point of research. But the development is hindered by the high cost and long period.
    同时因其存在一系列的缺点,开发高活性、低副作用的新型喹诺酮类药物一直是研究热点,但一直受到高昂的开发费用和较长的开发周期的限制。
  24. Traditional development approach bases on design-test-modification, which requires repeatedly testing and modifying design. This method increases project cost and development period.
    传统的研制途径是采用经验设计-试验-修改的方式,需要反复试验和修改设计,造成了工程成本和研制周期的增加。
  25. The components of cost in mining project and the factors influencing the cost are analyzed. Emphases of discussion are investment decision-making, design, bid invitation and measures of control of cost in construction period.
    分析了矿山工程造价的构成和主要影响因素,重点论述了矿山工程的投资决策、设计、招投标和施工阶段的工程造价控制的措施。
  26. The Calculation of the Lowest Cost Construction Period for Project
    工程最低成本工期计算
  27. Along with the change of management system of electricity enterprise, hydropower enterprise has gotten higher requests of maintenance quality, maintenance cost, maintenance period and equipments 'safe and stable operation.
    随着电力企业管理体制的变化,水电企业对检修质量、检修成本、检修工期和设备的安全稳定运行提出了更高要求。
  28. The ultimate objective is to minimize engineering cost and construction period in the context of ensuring the construction safety and quality.
    最终目标是在保证隧道施工安全和工程质量的前提下,最大限度的减少工程造价和缩短建设工期。
  29. The model optimizes the initial configuration of the product to make it be adaptive to the fluctuant market conditions with lowest cost in one period.
    该模型优化了模块化产品的初始设计,使得产品模块化的设计方案可以长时间地以最低的成本适应变动的市场条件。